FAQ 4

How long does it take to build a wooden airplane?

Build times will vary with the complexity of the aircraft. Biplane vs. single wing ultralight. Aircraft have been built in as little as 500 hrs but the covering and paint tend to add to that substantially. The new Oratex fabric that we sell as a covering option cuts construction time substantially. Typical full aircraft build times are in the 1200 to 1500 hour timeframe.

Shop